Spray the adhesive onto both surfaces and lay the roofing membrane as soon as the adhesive is touch-dry, on average after 4 to 6 minutes and no later than 60 minutes. Roll the membrane firmly to ensure full contact between the two adhesive layers. Take temperature, humidity, wind and dew point into account; consumption is 60–70 g/m².