Hoe verwerk je de Landscaping Foam en wanneer is de verbinding op sterkte?

Bring the aerosol can to a temperature between +10 °C and +25 °C, attach the hand adapter securely to the valve and shake at least 20 times; apply the product with the valve pointing downwards. Place the components into the fresh foam within the open time and support lightweight parts until sufficient initial strength has been achieved. The skin formation time is 8–12 minutes at 20 °C; the foam is cutable after 20–45 minutes and reaches its final strength after 24 hours.