Hoe bevestig je de Perimeter Strip?

Apply the strip horizontally or vertically around the roof edge using 50 or 76 mm steel fixing plates, before laying the roofing membrane. Then clean the EPDM where it will come into contact with the butyl mastic, apply Zettex P40 TF Primer and allow it to dry to the touch. Remove the protective film from one side, position the EPDM, peel off the rest of the film and roll it out from the centre outwards.