Clean and prime the roofing membrane beforehand using Zettex P40 Primer, usually over an area of approximately 10–12 cm around the pipe. Preferably apply Zettex MS 50 around the pipe, position the sleeve and stick the flange directly onto the roofing membrane using the pre-fitted tape and the two-part protective paper. Secure the sleeve with the supplied metal clamp and finish off the edge with MS 50.