Hoe breng je Zettex PU100 Isobond aan en wanneer is het dak weer beloopbaar?

Apply the adhesive in beads spaced approximately 25 cm apart, and no more than you can cover with insulation panels within 5 minutes. Press the panels firmly into place before a skin forms (after 4–5 minutes) and apply extra adhesive in the corners and along the edges. The roof surface will be walkable again after approximately 2 hours; the total curing time is 6 hours.