Waar moet je op letten bij het verwerken van Zettex X35 EPDM op het dak?

Spray the adhesive onto both surfaces and lay the roofing membrane as soon as the adhesive is touch-dry, on average after 4 to 6 minutes and no later than 60 minutes. Roll the membrane firmly to ensure full contact between the two adhesive layers. Take temperature, humidity, wind and dew point into account; consumption is 60–70 g/m².