Hoe lang moet Zettex X70 Primer drogen voordat je de dakbaan aanbrengt?

Under normal conditions, the primer dries in approximately 5–10 minutes. Apply the self-adhesive roofing membrane as soon as the primer is touch-dry and no longer leaves a wet mark, within the maximum working time of 25–30 minutes. Ensure that no moisture or solvent is trapped between the primer and the roofing membrane.